Quality
A defect on a wire becomes a crack in a forged part. So we control the material at every gate — from the mill’s rod to the tag on your coil.
Control gates
- 01
Incoming
Wire rod from primary mills only, received against the mill test certificate and tagged by heat number.
- 02
After pickling
Surface visually checked for remaining scale before the coil moves to the furnace.
- 03
Annealing
Cycle chosen per grade; every charge follows its heating, soak and cooling time.
- 04
Drawing
Die size set per order; first-off diameter measured before the coil is run.
- 05
Dispatch
Finished coil tagged with grade, size and heat so it can be traced back to the mill.
Parameters
Tolerances and test requirements are agreed with each customer per order.
Enquiries
We come back with availability and a quotation — usually the same working day.